When it comes to estimating the weight of an existing roof field verification of the in place construction is necessary.
Rolled hot mop roof.
They are designed for roofs with shallow pitches where the rise is no more than 4 inches in every 12 inches.
Hot mop roofing is a very dirty and somewhat dangerous job.
This is great news especially because the average tile roof will take anywhere between a week to up to 10 days to be completely installed.
If you live in an arid region or an older urban area you may have a large flat roof.
To install hot mop roofing roofers lay a synthetic base layer top it with a felt layer then pour liquid tar on the roof and spread this sealing compound with a mop which gives the process its name.
The pros of the hot mop option.
The hot asphalt is laid out evenly with a large heated mop over the surface.
A flat roof is usually slightly sloped.
Comes with a warranty that is viewed as above average.
The hot mop roof bur installation job can be completed within 2 to 4 days depending on the size of the roof and the number of installer we ve put on the job.
It may be covered with a granular roll roofing epdm which is smooth surfaced or modified bitumen which may be smooth or mineral surfaced.
At the same time a 90lb felt or modified bitumen cap sheet which is a type of asphalt that is modified with rubber or fiber is applied onto the hot asphalt.
To begin the hot mop process a layer of hot asphalt will be spread on top of the roof s base sheet.
Owens corning deckseal sa sbs cap 39 375 ft w x 32 833 ft l 100 sq ft shasta white roll roofing.
Some flat roofs have hot tar built up roofing which may have a gravel surface.
The asphalt is applied to the roof using a heated mop.
The words rolled roofing are pretty ambiguous however referring to not one but several different types of roofs that are available to you.
Easy to build up the low spots of the roof.
To install torch down roofing roofers roll out sheets of a bitumen containing material.
Rolled roofing or roll roofing things to know.
A built up roof for example will typically include the built up membrane itself with or without gravel as well as some kind of insulation and cover board which will vary in thickness from roof to roof.
A built up hot mop roof consists of layers of felt and asphalt over a bed of rosin paper.
Hot mopped roofing a time tested solution for commercial roofs if you ve ever seen a hot mopped roof install you ll be thankful your not the one doing it.
A modified bitumen cap sheet is then applied to the asphalt and both layers are nailed to the roof.