The flashing extends up the wall at least 4.
Roof flashing against stucco wall.
Above the roof sheathing.
Weep screed for stucco 2020 detail.
Installing the roofing felt.
I use a wide piece of flexible flashing tape to protect the area between the subfascia and the wall.
Installing step flashing to stucco walls step 1.
Kick out flashing for stucco 2019 detail.
The roof flashing cannot be installed on the outside of the stucco and counter flashed.
Cantilevered deck joist stucco 2020 detail.
Flashing a nail flange window 2018 rev detail.
Flexible flashing tape seals the eave to the wall.
Flashing joints are lapped 6 in the direction of water flow.
Once the flexible flashing is set i apply a piece of housewrap along the wall where the fascia meets it.
Slip the wall leg of the weep screed behind the existing paper.
Lay 2x4 blocks on the roof to set a consistent height for the weep screed flashing.
Sill pan for nail flange windows 2020 detail.
Add cement and flashing.
The water that does penetrate behind the stucco will then be trapped there or worse forced down the inside of the walls and ceilings possibly causing damage and mold.
I cut the tape so that it laps onto the housewrap above and 3 in.
Wall to roof deck flashing 2020 detail.
After removing the stucco slide a 2x2 galv flashing up behind the paper.
Next you will use asphalt or roofing cement.
Now the water that is running down the wall inside the stucco will exit the stucco onto the flashing you installed not behind it.
Layer the cement on the area that you.
The flashing extends onto the roof a minimum of 2 inches 4 inches is preferable in more severe climate areas.
In this video kirk giordano demonstrates how to counter flash the bottom of a stucco wall over the step flashing of the roof so that no one has to jackhammer your walls just to fix a roof.
After the roofing is installed slide the flashing down to the roofing material and seal it well.
The metal flashing is formed with a hook edge and cleated on 12 centers.
Control joint at floor line 2016 detail.